On July 4th, an AOG left Roissy-Charles-de-Gaulle tarmac.
After a 1150 km ride through France to Genoa, Italy, aboard a CHABRILLAC extra-low-bed trailer, the material finally embarked on July 7th for a 1320 km journey through the Mediterranean sea.
On July 9th, the AOG was able to sight Malta island approaching on the horizon from its 3,38 meters high. It landed in Valletta with the sunrise.
Once delivered, the driver and its semi-trailer left the island by evening to reach back the continent.